Cranes Technology Committee Meeting
9 June 2025 • The Westin Indianapolis • Indianapolis, IN, USA
►Agenda (PDF)
►Register or contact ldlugopolski@aist.org
Arrangements
The Westin Indianapolis at 241 W Washington St, Indianapolis, IN 46204
Reserve by 19 May 2025 for AIST Room Rate of $219.00 per night
A block of rooms has been reserved at The Westin Indianapolis. Please call the hotel at +1.317.262.8100 by 19 May 2025 to secure the AIST discount rate of US$219 per night for single/double occupancy.
AIST technology committee members are asked to print out the latest revised meeting agenda from our website one week prior to this meeting.
- Chair’s opening remarks 2:00 pm
- Appoint minute-taker
- Antitrust guidelines
- Membership and attendance
- Review minutes of previous meeting
- AIST Staff Announcements
- Steel Industry Fatalities
Main agenda items
- Technology committee award planning
- Finalize committee roundup (if applicable)
- Technology Training conference
- Crane Symposium
Discussion items
- Technical Report Status per minutes of last meeting:
- TR 1, 1A - D/C, A/C motors
- The decision was to achieve this with no changes planned.
- TR 4 – Alloy Sling Chains
- The decision was to achieve this with no changes planned.
- TR 6 – Spec. for EOH Cranes
- Report of 18 February meeting
- Good meeting yesterday, mainly with regard to electrical session
- Structural/Mechanical sections still need to be worked on
- A number of additions are suggested
- Power Limit Switches was given as an example
- Another meeting this month to go over all the changes that need to be made
- Full meeting at AISTech
- TR 7 – Ladle Hooks
- Last printed in 2020 and available, no further action.
- TR 8 – Insulated Conductors for Mill Motors
- Report of 18 February meeting
- Zoom meeting last Friday, was supposed to have a meeting in person here
- Continue to set up a monthly 1 hour meeting to take care of this, bit at a time
- TR 11 – Mill Motor Brakes
- Report of 18 February meeting
- Good working group yesterday
- Re-lining and edits complete
- Finishing final document to send Ken
- TR 13 – Guide for the Design and Construction of Mill Buildings
- Report of online meetings
- No new activity this meeting
- Debates on standards for Crane Rail Survey
- Specs for Crane Rail when first installed
- Specs for previous installations
- Load testing against existing standards at time of installation
- Additional meetings needed still
- Maint, Insp and Repair Guide
- Last printed in 2017 and available
- No further action required at this time.
- Crane Safety and Training Technical Report
- Report of 18 February meeting
- We went through a huge number of topics
- Outlines for certain topics that should be turned into a list of guidelines
- Direction for the report/guidelines decided
- Reference Documents uploaded for the topics and comments made yesterday
- Keeping in mind that it’s not a procedure, there is an emphasis on making it easy to digest, and how much reference documentation needs to be inserted in the end result
Next meeting
Fall 2025:
Date:
Location
Tour
- Spring 2026:
- Date:
- Location
- Tour
- Chair conclusion