Fincantieri Holds Steel Cutting Ceremony for PPA 9
10/16/2026 - The first steel cutting ceremony was held for the ninth multipurpose patrol ship (PPA 9) at Fincantieri’s Riva Trigoso shipyard in Italy, reported Naval News.
The company said this is the seventh and final ship that will be delivered to the Italian Navy. Five of the seven vessels are currently contracted for delivery while the sixth is under construction.
PPA 9 will be constructed in full combat configuration, designed for the full spectrum of maritime missions and warfare. It will feature an enhanced combat system, Naval News said.
For more information, click here.
PPA 9 will be constructed in full combat configuration, designed for the full spectrum of maritime missions and warfare. It will feature an enhanced combat system, Naval News said.
For more information, click here.





